01760 788 491 hello@ukstairs.co.uk

Frequently asked question

Payment

How do stage payments work?

10% on order, 40% on drawing approval (before fabrication), 50% on delivery or seven days before installation—whichever is earlier. Title passes only after full payment.

How long is my quote valid?

30 days from the date shown. Prices exclude VAT unless stated. Retentions are not allowed.

Do you charge interest or storage if dates slip?

Yes. Late payments may accrue interest at 4% above the Bank of England base rate. Storage or re-delivery may be charged if the site is not ready.

When does risk pass to me?

On delivery to site or on collection. Ownership passes when we receive full payment.

Installation

What installation options do you offer?

Three routes: Partial Installation (most jobs), Full Installation, or DIY with our six easy-fit designs. Partial keeps costs down; we fit critical items and your builder does the simple finishes. Full means we handle everything on site.

What site conditions do you need on the day?

Clear, safe work area with power, lighting, welfare, and safe platforms. Scaffolds/edge protection/lifting gear by others unless stated. Protect finished floors. Do not use the staircase for general access until we confirm it is safe.

What about hidden services and dust control?

Tell us in writing about cables or pipes near fixings. We may use tools outside to reduce dust, so please make space.

Can a competent builder self-install?

Yes—for our six easy-fit designs. No special tools or welding. You get installation drawings, a fixings list, and phone support. 

Design

Do you design to UK Building Regulations ?

We manufacture according to the latest approved drawings and follow relevant standards for the intended use. You handle Planning/Building Control approvals.

What design loads do you allow for?

As standard: 1.5 kN/m² on treads/landings and 0.36 kN/m line load at the handrail/top of balustrade. Tell us if you need higher loads (public/external).

Who provides structural calculations and fixings to the building?

You/your engineer. Our design covers the goods we supply; the structure and fixings must resist the stated loads.

What do you need before you draw and fabricate?

A survey with safe access and clear datums, then your written drawing approval. Changes after approval may affect price and dates.

Ready to find out more? Click for your free quote

Staircase style selector

CANTILEVER

CENTRE SPINE

INBOARD STRING

CUT STRING

STRAIGHT STRING

ZIGZAG STRING

Brochure request

    Follow us

    1 week ago

    Real or render? We’ll let you zoom in and decide... 👀This beauty features a centre spine design, glass balustrades, oak treads, and an oak handrail — with a subtle LED glow under each step. We even threw in a chunky two-step landing at the bottom, just because we could.#DolceDesignLondon #StaircaseRender #RealOrRender #CentreSpineStaircase #OakAndGlass #InteriorDesignUK #StaircaseInspo #LEDStairs #BespokeJoinery ... See MoreSee Less
    View on Facebook

    Contact us

    Call us on 01760 788 491
    Email hello@ukstairs.co.uk